Floating Transition Flashing - High To Low - Part #WS-119

Floating transition flashing means that the standing seam panels aren't pinned in place at the pitch break. This allows for expansion and contraction. If you have a floating transition, you will need a fixed connection at the other end of the standing seam panel. 

Most of the jobs that we supply have a fixed transition flashing. This detail is not used that often.

WS-119 - FLOATING TRANSITION - HIGH TO LOW - PARTS LIST

This parts list is designed to help you calculate the quantity of accessories that you’ll need for your trim installation. It has all of the accessories that are needed to install 1 full piece of trim, which is 120" long. To calculate the total number of accessories you will need for your job, simply take the number of trim pieces associated with the trim part purchased and multiply the list by that number for a total for your project.

Components List

  • 1 Piece Transition Flashing - WS-119
    Roof Pitch Required (Both Sides)
  • 1 Piece Panel End Support - WS-112
  • 1 Piece Zee Closure - WS-114
  • 56 Pancake Head Screws (#10X1") NO Washer
    Verify Metal To Wood
  • 10 Metal To Metal Lap Screws With Sealing Washer
  • 30 Linear Feet Of Double Sided Butyl Tape, 3/16" X 7/8"
  • 2 Tubes Butyl Sealant
  • 1/4 Tube Silicone Sealant

WSMR Recommends the use of a water barrier or underlayment prior to the installation of the trim components or metal roofing panels.

We recommend:

 